Soil Moisture Protocol:
Optional Gypsum block depth profile


  • Purpose: Demonstration of Gypsum block installation and calibration
  • Emphasis: Protocol
  • Total Training Time: 5 minutes
  • Training Location: Outside
  • Connections: Weight-based (gravimetric) measurements

    4) Gypsum block installation

    (This should be a direct continuation of gravimetric demo)

    5) Gypsum block calibration


    v. Jul 9, 1996